Allen Padgham Bridge Replacement

The County will be replacing the Allen Padgham Road Bridge over Ganargua Creek located in the Town of Farmington during the 2018 construction season. The project will provide a new steel multi-girder bridge on a slightly new alignment. Highway drainage and waterline improvements will also be done as part of the project.

Construction of the project was awarded to Economy Paving of Cortland, NY at a cost of $1,920,920.92. The road will be closed to all traffic beginning on March 26th and is scheduled to be reopened in late September.

​Please see the following links for more information:

Road Closure Notice
Design Plans
Proposed Schedule

​Please note: The dates shown in the schedule are subject to change as required by project constraints. If you should have any questions regarding the project please contact Chris Day at (585) 396-4282 or email christopher.day@co.ontario.ny.us

Begin Abutment Toward Bridge
Begin Abutment Away Bridge
End Side Pier
Construction Photos: Below are a handful of current construction photos but click here to view a full album of construction photos
Excavation Equipment
Removing Deck
Cofferdam Placement
North Abutment Demo
The above 4 pictures show the early stages of demolition, including the placement of a cofferdam and the north abutment